Project Management

At Orana Engineering, project management is about delivering high quality outcomes for our clients.  Our experienced Project Managers co-ordinate all aspects of a project to ensure the client’s targets are consistently achieved.  Managing the core elements of cost, quality and schedule, successful project management realises the right balance and manages conflicts between each one.

Also of great importance for successful project management is the understanding of the client’s needs and expectations. Orana Engineering’s Project Managers have a unique skillset to draw upon with their combination of site experience, practical backgrounds and engineering qualifications allowing them to truly understand our clients' needs and expectations and create outcomes that align with this, meeting all key HSEC, quality assurance, cost and schedule targets throughout the process.

In the role of Project Manager, Orana Engineering has the experience and resources to:

  • Co-ordinate various work groups and organisations;
  • Schedule and co-ordinate regular meetings;
  • Manage project variations;
  • Promote and enforce client HSEC requirements;
  • Prepare and track project schedules;
  • Communicate project matters to all relevant parties;
  • Schedule permits and outages;
  • Prepare project reports; and
  • Track budgets, budget forecasting and cost control.

Engaging our project management services ensures that all aspects which effect the delivery of a project are the responsibility of our Project Managers, including resolving commercial issues, tendering and liaising with subcontractors, risk management and HSEC issues, commissioning and handover.  Personnel have access to a wide range of tools, procedures and processes that have been developed and refined by Orana Engineering to ensure effective cost estimation, management of budgets and change management.

Our project management services are of value throughout all stages of a project, from concept design through to detailed design, construction and handover.  An experienced Orana Engineering Project Manager adds value to a project by:

  • Dedicating a resource to manage the project, freeing up the time of the client so they can focus on the day to day operational issues;
  • Allowing clients to remain informed and be in control of the project without having to dedicate time to managing the details;
  • Providing the potential to achieve the highest quality outcome by engaging a practical Project Manager that has the time, expertise and experience to do the job right.  Orana Engineering’s Project Managers are skilled engineers with hands on site experience;
  • Seamlessly integrating additional services as required such as Client Engineer, design drafting, drawing revisions and drawing management giving clients one point of contact for any mechanical, electrical, structural or control systems engineering services requirements; and
  • Offering the confidence of an experienced project management service with a proven track record.

An added advantage of being a smaller organisation is that for larger projects (i.e. >$2.5M), we can act on behalf of the client in the role of Project Manager and/or Client Engineer without a conflict of interest, as Orana Engineering do not tend to pursue design works for larger engineering projects.

Orana Engineering has a proven track record ensuring outcomes are consistently achieved and has project managed projects with values in excess of $20M.  Our reliable Project Managers are technical experts and bring a depth of knowledge and experience to every project.

Contact Orana Engineering for further information about our project management services or to request a no obligation proposal. Our Capability Statement is also available for download providing more information about the services Orana Engineer offers. 

Contact Us

Orana Engineering Project Management

UG Conveyor Installations - MG Mechanical Installation

Detailing the installation of mechanical equipment and conveyor structure is one of the final steps for completing a maingate drive-head design. Installations designed by Orana Engineering (MG32, MG33, MG33C, MG34, MG35 and MG36) for Glencore’s Oaky No.1 underground coal mine typically detail the arrangement of drives, transfer stations, take-up units, maintenance equipment and overhead structure to support the carry belt.

Read more
UG Conveyor Installations - MG Mechanical Installation

Combabula Bore Pump

Prime Pump Company was contracted by Origin Energy and Laing O’Rourke to supply an upgraded bore pumping system at an existing bore site at the Origin Energy Combabula site.  RIE Services was contracted by Prime Pump Company to provide supply and installation of the electrical components for the upgrade.

Read more

UG Conveyor Installations – MG32 Tripper Civil Design

The site engineers at Glencore’s Oaky No. 1 underground coal mine have engaged Orana Engineering to determine the extent of the civil work required to install the maingate tripper equipment in MG32 longwall conveyor.

Read more
UG Conveyor Installations – MG32 Tripper Civil Design

MG07 Conveyor – Chamber Design

Carborough Downs Coal Mine is an underground operation located in Central Queensland that utilises conveyors to transport mined coal to the surface for processing. As operations progress and new longwall headings are mined, new conveyor installations are also required. Designing a conveyor installation involves 3 major stages: the drive-head chamber design, the civil design, and the mechanical arrangement design.

Read more
MG07 Conveyor – Chamber Design

Mill Gear Box Frame

The IMT project team at MMG’s Century Zinc operations enlisted the assistance of Orana Engineering to produce a set of fabrication drawings for an existing gear box frame which required replacing. Although the frame itself had been in operation for quite some time, there were no detailed drawings available that could be used for the construction of a replacement unit.

Read more
Mill Gear Box Frame

FB-028 Tank Lifting Beam

During an upgrade to the Concentrator at MMG’s Century Mine located in Western Queensland, Orana Engineering was engaged to design a lifting beam for the installation of a new flotation cell.

Read more
FB-028 Tank Lifting Beam

Redraw Electrical Drawings

To ensure plant maintainability and personnel safety, Dyno Nobel employed the services of Orana Engineering to redraw its low voltage (LV) and high voltage (HV) single line diagrams (SLD) whilst also confirming the drawings accuracy and functionality.

Read more
Redraw Electrical Drawings

Tippler Refurbishment Feasibility

The Glencore Port Operations in Townsville operate an export facility for minerals concentrate and refined copper within the Port of Townsville precinct. The concentrate in-loading rotaside tippler has been identified as being at end of life and a feasibility study was commissioned in order to review the like-for-like replacement option for refurbishment of the tippler, considering the increased demand on the tippler moving forward.

Read more
Tippler Refurbishment Feasibility

Sewage Treatment Plant Refurbishment

To increase productivity as well as maintaining compliance with current legislative standards, Glencore Coal employed the services of Orana Engineering to design, manage and oversee the installation of the electrical portion of their sewage treatment plant upgrade.

Read more

UG Conveyor Installations – MG32 Tripper Mechanical Design

In high capacity longwall conveyor arrangements, the installation of a tripper will typical occur after the chamber has been fully developed. The installation designed by Orana Engineering for MG32 conveyor for Glencore’s Oaky No.1 underground coal mine detailed the arrangement of the tripper drives, brakes, pulley frame and load station.

Read more
UG Conveyor Installations – MG32 Tripper Mechanical Design