Design Drafting

Design drafting is the process of graphically communicating the works that are to be performed for a project. When well executed, design drafting is cost effective and increases the likelihood of project solutions being delivered that are safe, easily maintainable, on schedule, on budget and consistently meet or exceed the original requirements. Design drafting provides an opportunity to visualise the proposed project outcome and ensures that all involved on a project are working towards common goals with sufficient detail.

Like all effective communications, accuracy, relevance and presentation are essential.  Design drafting must cater to the entire audience who will use and depend on the drawings, before, during and after the project.  Design drafted drawings are relied upon from the concept and construction stage of a project, right through to ongoing maintenance and operations requirements, and form the basis for future modifications and growth.  From well design drafted drawings, the ongoing process of drawing management and drawing revisions is greatly simplified.  For our clients this means the benefit of accessible, accurate and timely information on an ongoing basis.

Orana Engineering’s unique and customised approach to design drafting strives to ensure that:

  • All aspects of a project’s implementation are fully considered to avoid unforeseen surprises;
  • Personnel of all engineering disciplines and professions involved in the project (client, project management, design, construction and maintenance) are fully informed and have given thorough consideration to the design and what is required of them to achieve it; and
  • Critical to brownfield operations, that there is no potential for drawings proposing a project’s scope to be confused with drawings of what is actually installed, avoiding an unsafe situation where site maintenance personnel could be working with an incorrect revision of a drawing.

Our projects are delivered to meet the HSEC, quality assurance, cost and schedule targets originally set. Considering this, good design drafting does not necessarily reduce the cost of a project, rather it strives to increase cost efficiencies by preventing project cost and schedule blowouts, which can ultimately impact safety and quality. What design drafting really targets is eliminating the negative impacts that insufficient or poor design drafting can have on the cost, quality and schedule of a project as well as the safety of those relying on the accuracy of drawings.  Onsite design modifications during or after construction are far more costly and time consuming to resolve as opposed to modifications when they are identified offsite or before procurement of incorrect equipment.

The key to delivering high quality and valued design drafting services lies within our in-house resources, expertise and focus on quality.  Internal quality assurance systems at Orana Engineering are first rate and at the core of the design drafting we produce.  Our best practice approach means that our learnings are continuously incorporated into our work to benefit all clients.  We are experienced working with a wide range of tools for design drafting, such as AutoCAD, Inventor and other Autodesk products.

Our multi-discipline design drafting services include:

While design drafting can be offered as a stand-alone service which is inclusive of the necessary engineering certifications, our clients can benefit from Orana Engineering’s portfolio of other drafting related services such as drawing management and drawing revision while also taking advantage of other services provided by Orana Engineering including engineering services, project management and Client Engineer.

Contact us for further information regarding the design drafting services provided by Orana Engineering or to obtain a quote for design drafting assistance that you require. Review our capabilities for other details you may require.

Contact Us

Orana Engineering Design Drafting

Gold Slurry Sampler

Orana Engineering was engaged to design new sampling equipment for improved sampling effectiveness at Carpentaria Gold’s Ravenswood operations. A site visit was undertaken by Orana Engineering design staff to accurately record critical data. This enabled designers to produce a detailed 3D model which was used extensively during interactions with the client and ensured a fluent understanding of the project scope by both parties throughout the design process. Orana Engineering was able to integrate new sampling equipment into the existing plant whilst minimising any impact on the operation. Various challenges were overcome with the result being successful delivery of drawings for fabrication and installation of equipment, allowing improved sampling and production reconciliation whilst minimising impact to operations.

Read more
Gold Slurry Sampler

Heavy Vehicle Washdown Facility

MMG's Karumba Port Facility engaged Orana Engineering to design a heavy vehicle washdown facility to assist with management of concentrate for site vehicles and machinery. The time frame was short due to operational requirements, such that Orana Engineering worked from concept to IFC drawings in just seven days. The design needed to accommodate a number of different vehicles from fully laden container trailers to a 30 tonne forklift, whilst also ensuring ease of facility maintenance and capture of runoff for environmental compliance. Concept sketches were prepared, from which a detailed design was developed to meet client requirements. Through effective communication with the client Orana Engineering was able to deliver the design in a compressed timeline, to specification and budget.

Read more
Heavy Vehicle Washdown Facility

Inner Bypass Valves

Orana Engineering was engaged by MMG's Century Mine to design an upgrade within the concentrator for increased flow from a flotation cell to a tailings trough. Orana Engineering conducted a concept investigation of available options to increase the flow rate. Results were presented for a range of design and operating conditions, and a preferred option was selected for detailed design. Orana Engineering design staff created a 3D model of the new pipeline using Autodesk Inventor. The 3D model was used to produce fabrication drawings for pipe supports, new platform and new pipe bridge. Drawings also included isometric pipe spool drawings and revised P&ID drawings.

Read more
Inner Bypass Valves

Jaw Crusher Platform

The maintenance department of Eloise Copper Mine contacted Orana Engineering with a requirement for design of an access platform for their jaw crusher, including engineering certification and drafting. The client provided site measurements and a basic concept of the design they were looking for. Being a brownfield engineering project, the design had to consider the surrounding area and existing structures to minimise modifications. Autodesk Inventor was used to create a basic 3D model of the area. Once the physical data was established the detailed design of the platform was able to be performed efficiently. Orana Engineering was able to produce both detailed shop drawings for fabrication and site installation drawings, all of which were provided with structural engineering certification.

Read more
Jaw Crusher Platform

MG07 Conveyor – Chamber Design

Carborough Downs is an underground operation utilising conveyors to transport mined coal to the surface. As new longwall headings are mined, new conveyor installations are also required. Orana Engineering was engaged to complete a drive-head chamber design, ensuring adequate sizing for installation of conveyor equipment. During initial mining of the chamber, a coal seam fault line was discovered. Carborough Downs requested that Orana Engineering develop a chamber design that maximised product mined through the fault area, while working within conveyor installation constraints. Using AutoCAD, Orana Engineering produced several design options and sketches for client approval and reference during mining processes. Orana Engineering provided final chamber excavation drawings, which were developed into mine designs and sequence plans, by site mining engineers.

Read more
MG07 Conveyor – Chamber Design

MG07 Conveyor – Civil Design

Carborough Downs is an underground operation utilising conveyors to transport mined coal to the surface. As new longwall headings are mined, new conveyor installations are also required. During installation of conveyors in an underground environment it is vital that the civil design is detailed accurately as this is the basis for locating and installing conveyor equipment. Orana Engineering was engaged to complete this design and used AutoCAD to develop a civil design that met the client’s constraints and constructability requirements. From this design Orana Engineering produced a drawing set detailing civil aspects of the conveyor design, including floor / rib trimming, equipment hold-down details, configuration of concrete reinforcing and overall grade of concrete.

Read more
MG07 Conveyor – Civil Design

MG07 Conveyor – Development Conveyor

Carborough Downs Coal Mine is an underground operation utilising conveyors to transport mined coal to the surface for processing. As operations progress and new longwall headings are mined, new conveyor installations are also required. Carborough Downs engaged Orana Engineering to complete a mechanical arrangement design for configuration of conveyor equipment. The design had to consider several factors, including meeting required operating capabilities, ensuring unimpeded access along travel roads and maintaining minimum belt curves. Using AutoCAD, Orana Engineering developed a mechanical design that met client constraints and constructability requirements. From the design, a drawing set was produced detailing mechanical aspects of the conveyor design, including equipment configuration, and extensive details for selection and installation of conveyor structures, whilst minimising curves.

Read more
MG07 Conveyor – Development Conveyor

MG08 Development Conveyor

Carborough Downs Coal Mine is an underground operation utilising conveyors to transport mined coal to the surface for processing. As operations progress and new longwall headings are mined, new conveyor installations are also required. Orana Engineering was engaged to design a new longwall drive-head chamber and conveyor installation, initially providing a drawing set detailing required drive-head chamber dimensions to suit the conveyor installation. Using AutoCAD, a civil design and conveyor equipment arrangement was produced. The conveyor design had to consider several constraints, including available equipment, transfer tie-in to existing trunk conveyor, maintenance access, drainage, minimum clearances and belt curves. Upon layout approval, AutoCAD drawings were produced detailing civil and mechanical design aspects, enabling site engineers to complete installation with efficiency while ensuring regulatory compliance.

Read more
MG08 Development Conveyor

MIBC & Diesel Upgrade

The purpose of the Reagent System Upgrade at Oaky Creek was installation of new reagent storage tanks, discharge / delivery pumping systems and automated flow control distribution manifolds for the delivery of each reagent to the nominated process connections. Orana Engineering performed mechanical, electrical and control systems design, drafting and engineering for the project. The primary deliverables included scope of works, construction drawings, functional specification, BOM, spares lists and equipment / instrument data sheets. Orana Engineering managed the onsite commissioning of the system and provided a system handover to operations for implementation. An Operation & Maintenance Manual and Hazardous Area Dossier were provided on project completion.

Read more
MIBC & Diesel Upgrade

Mill Gear Box Frame

The IMT project team at MMG’s Century Zinc operations enlisted the assistance of Orana Engineering to produce a set of fabrication drawings for an existing gear box frame that required replacing. The frame had been in operation for some time, however there were no detailed drawings available for construction of a replacement unit. The design staff at Orana Engineering created a detailed 3D model using client-supplied photos and sketches, enabling designers to produce 2D fabrication drawings for approval. A review of the drawings was conducted by the client to confirm the layout and accurate alignment with the existing installation on site. Following minor adjustments, As-Built status drawings were reissued to the client, accurately capturing detail of the existing frame.

Read more
Mill Gear Box Frame