Project Management

At Orana Engineering, project management is about delivering high quality outcomes for our clients.  Our experienced Project Managers co-ordinate all aspects of a project to ensure the client’s targets are consistently achieved.  Managing the core elements of cost, quality and schedule, successful project management realises the right balance and manages conflicts between each one.

Also of great importance for successful project management is the understanding of the client’s needs and expectations. Orana Engineering’s Project Managers have a unique skillset to draw upon with their combination of site experience, practical backgrounds and engineering qualifications allowing them to truly understand our clients' needs and expectations and create outcomes that align with this, meeting all key HSEC, quality assurance, cost and schedule targets throughout the process.

In the role of Project Manager, Orana Engineering has the experience and resources to:

  • Co-ordinate various work groups and organisations;
  • Schedule and co-ordinate regular meetings;
  • Manage project variations;
  • Promote and enforce client HSEC requirements;
  • Prepare and track project schedules;
  • Communicate project matters to all relevant parties;
  • Schedule permits and outages;
  • Prepare project reports; and
  • Track budgets, budget forecasting and cost control.

Engaging our project management services ensures that all aspects which effect the delivery of a project are the responsibility of our Project Managers, including resolving commercial issues, tendering and liaising with subcontractors, risk management and HSEC issues, commissioning and handover.  Personnel have access to a wide range of tools, procedures and processes that have been developed and refined by Orana Engineering to ensure effective cost estimation, management of budgets and change management.

Our project management services are of value throughout all stages of a project, from concept design through to detailed design, construction and handover.  An experienced Orana Engineering Project Manager adds value to a project by:

  • Dedicating a resource to manage the project, freeing up the time of the client so they can focus on the day to day operational issues;
  • Allowing clients to remain informed and be in control of the project without having to dedicate time to managing the details;
  • Providing the potential to achieve the highest quality outcome by engaging a practical Project Manager that has the time, expertise and experience to do the job right.  Orana Engineering’s Project Managers are skilled engineers with hands on site experience;
  • Seamlessly integrating additional services as required such as Client Engineer, design drafting, drawing revisions and drawing management giving clients one point of contact for any mechanical, electrical, structural or control systems engineering services requirements; and
  • Offering the confidence of an experienced project management service with a proven track record.

An added advantage of being a smaller organisation is that for larger projects (i.e. >$2.5M), we can act on behalf of the client in the role of Project Manager and/or Client Engineer without a conflict of interest, as Orana Engineering do not tend to pursue design works for larger engineering projects.

Orana Engineering has a proven track record ensuring outcomes are consistently achieved and has project managed projects with values in excess of $20M.  Our reliable Project Managers are technical experts and bring a depth of knowledge and experience to every project.

Contact Orana Engineering for further information about our project management services or to request a no obligation proposal. Our Capability Statement is also available for download providing more information about the services Orana Engineer offers. 

Contact Us

Orana Engineering Project Management

Gold Slurry Sampler

Orana Engineering was engaged to design new sampling equipment for improved sampling effectiveness at Carpentaria Gold’s Ravenswood operations. A site visit was undertaken by Orana Engineering design staff to accurately record critical data. This enabled designers to produce a detailed 3D model which was used extensively during interactions with the client and ensured a fluent understanding of the project scope by both parties throughout the design process. Orana Engineering was able to integrate new sampling equipment into the existing plant whilst minimising any impact on the operation. Various challenges were overcome with the result being successful delivery of drawings for fabrication and installation of equipment, allowing improved sampling and production reconciliation whilst minimising impact to operations.

Read more
Gold Slurry Sampler

Heavy Vehicle Washdown Facility

MMG's Karumba Port Facility engaged Orana Engineering to design a heavy vehicle washdown facility to assist with management of concentrate for site vehicles and machinery. The time frame was short due to operational requirements, such that Orana Engineering worked from concept to IFC drawings in just seven days. The design needed to accommodate a number of different vehicles from fully laden container trailers to a 30 tonne forklift, whilst also ensuring ease of facility maintenance and capture of runoff for environmental compliance. Concept sketches were prepared, from which a detailed design was developed to meet client requirements. Through effective communication with the client Orana Engineering was able to deliver the design in a compressed timeline, to specification and budget.

Read more
Heavy Vehicle Washdown Facility

Inner Bypass Valves

Orana Engineering was engaged by MMG's Century Mine to design an upgrade within the concentrator for increased flow from a flotation cell to a tailings trough. Orana Engineering conducted a concept investigation of available options to increase the flow rate. Results were presented for a range of design and operating conditions, and a preferred option was selected for detailed design. Orana Engineering design staff created a 3D model of the new pipeline using Autodesk Inventor. The 3D model was used to produce fabrication drawings for pipe supports, new platform and new pipe bridge. Drawings also included isometric pipe spool drawings and revised P&ID drawings.

Read more
Inner Bypass Valves

Jaw Crusher Platform

FMR Investment's Eloise Copper Mine is an underground mining operation producing copper concentrate for export.  The maintenance department of Eloise Copper Mine contacted Orana Engineering with a specific requirement for the design of an access platform for their jaw crusher including engineering certification and drafting.  The client provided Orana Engineering with site measurements and a basic concept of the design they were looking for.

Read more
Jaw Crusher Platform

MG07 Conveyor – Chamber Design

Carborough Downs is an underground operation utilising conveyors to transport mined coal to the surface. As new longwall headings are mined, new conveyor installations are also required. Orana Engineering was engaged to complete a drive-head chamber design, ensuring adequate sizing for installation of conveyor equipment. During initial mining of the chamber, a coal seam fault line was discovered. Carborough Downs requested that Orana Engineering develop a chamber design that maximised product mined through the fault area, while working within conveyor installation constraints. Using AutoCAD, Orana Engineering produced several design options and sketches for client approval and reference during mining processes. Orana Engineering provided final chamber excavation drawings, which were developed into mine designs and sequence plans, by site mining engineers.

Read more
MG07 Conveyor – Chamber Design

MG07 Conveyor – Civil Design

Carborough Downs is an underground operation utilising conveyors to transport mined coal to the surface. As new longwall headings are mined, new conveyor installations are also required. During installation of conveyors in an underground environment it is vital that the civil design is detailed accurately as this is the basis for locating and installing conveyor equipment. Orana Engineering was engaged to complete this design and used AutoCAD to develop a civil design that met the client’s constraints and constructability requirements. From this design Orana Engineering produced a drawing set detailing civil aspects of the conveyor design, including floor / rib trimming, equipment hold-down details, configuration of concrete reinforcing and overall grade of concrete.

Read more
MG07 Conveyor – Civil Design

MG07 Conveyor – Development Conveyor

Carborough Downs Coal Mine is an underground operation utilising conveyors to transport mined coal to the surface for processing. As operations progress and new longwall headings are mined, new conveyor installations are also required. Carborough Downs engaged Orana Engineering to complete a mechanical arrangement design for configuration of conveyor equipment. The design had to consider several factors, including meeting required operating capabilities, ensuring unimpeded access along travel roads and maintaining minimum belt curves. Using AutoCAD, Orana Engineering developed a mechanical design that met client constraints and constructability requirements. From the design, a drawing set was produced detailing mechanical aspects of the conveyor design, including equipment configuration, and extensive details for selection and installation of conveyor structures, whilst minimising curves.

Read more
MG07 Conveyor – Development Conveyor

MG08 Development Conveyor

Carborough Downs Coal Mine is an underground operation utilising conveyors to transport mined coal to the surface for processing. As operations progress and new longwall headings are mined, new conveyor installations are also required. Orana Engineering was engaged to design a new longwall drive-head chamber and conveyor installation, initially providing a drawing set detailing required drive-head chamber dimensions to suit the conveyor installation. Using AutoCAD, a civil design and conveyor equipment arrangement was produced. The conveyor design had to consider several constraints, including available equipment, transfer tie-in to existing trunk conveyor, maintenance access, drainage, minimum clearances and belt curves. Upon layout approval, AutoCAD drawings were produced detailing civil and mechanical design aspects, enabling site engineers to complete installation with efficiency while ensuring regulatory compliance.

Read more
MG08 Development Conveyor

MIBC & Diesel Upgrade

The purpose of the Reagent System Upgrade at Oaky Creek was installation of new reagent storage tanks, discharge / delivery pumping systems and automated flow control distribution manifolds for the delivery of each reagent to the nominated process connections. Orana Engineering performed mechanical, electrical and control systems design, drafting and engineering for the project. The primary deliverables included scope of works, construction drawings, functional specification, BOM, spares lists and equipment / instrument data sheets. Orana Engineering managed the onsite commissioning of the system and provided a system handover to operations for implementation. An Operation & Maintenance Manual and Hazardous Area Dossier were provided on project completion.

Read more
MIBC & Diesel Upgrade

Mill Gear Box Frame

The IMT project team at MMG’s Century Zinc operations enlisted the assistance of Orana Engineering to produce a set of fabrication drawings for an existing gear box frame which required replacing. Although the frame itself had been in operation for quite some time, there were no detailed drawings available that could be used for the construction of a replacement unit.

Read more
Mill Gear Box Frame